< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1661674758165054&ev=PageView&noscript=1" />

Pan Pacific Dalian | Hotel Hot Water Supply | 3 units of commercial condensing gas wall-hung boilers

Installation Method of Commercial Water Heater:

  • Equipment Used: 3 sets of commercial condensing gas wall-hung boilers
  • Hot Water Demand: Domestic hot water supply
  • Installation Location: Indoor boiler room

These three wall-hung boilers supply the entire hotel with heating.

Installation Site Photos