< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1661674758165054&ev=PageView&noscript=1" />

“Mino Hotel & Qiuguo Hotel”, No.5 Zhongguancun | Hotel Hot Water and Heating | 6 Units of Commercial Condensing Gas Floor-Standing Boilers

Installation Method of Commercial Water Heater:

  • Equipment Used: 6 units of commercial condensing gas floor-standing boilers (Model CBF99)
  • Hot Water Demand: Domestic hot water and heating
  • Installation Location: Rooftop on the top floor

These 6 commercial condensing gas floor-standing boilers provide heating for the two hotels covering a total area of 6,000 ㎡. Among them, 4 boilers serve the 3,000 ㎡ of Qiuguo Hotel, and the other 2 serve the 3,000 ㎡ of Mino Hotel.

Installation Site Photos